TOP BEDROOM: Quite small, dated, no character.
SCOPE OF WORKS: Strip all surfaces, remove eve partition, install new floor, remove chimney breast, replaster, strip and varnish beam, new skirtings and architrave, new door to 1st floor, decorate and carpet.
TOP BEDROOMS POST WORKS: Lovely spacious second bedroom, character of varnished beam, high spec finish.
Top Bedroom Before
Top Bedroom After
Top Bedroom Before
Top Bedroom After
BATHROOM: Poorly configured bathroom due to chimney and wall, limited access to sink.
SCOPE OF WORKS: Remove chimney breast and part of wall, install steels and straps, relay floor, plaster throughout, false ceiling, spotlights, fully tiled floor, half tiled walls, new bathroom suite and extractor fan.
BATHROOM POST WORKS: High spec, modern with contemporary finish incorporating metro tiles, black floor tiles, L Shaped bath with thermo shower and drench shower head, heated towel rail, corner toilet.
Bathroom Before
Bathroom After
Bathroom Before
Bathroom After
FIRST FLOOR BEDROOM: Dated, but spacious master bedroom, general condition quite good.
SCOPE OF WORKS: Stripping all surfaces, replastering, new woodwork, doors and cornice, decorate and carpet.
FIRST FLOOR BEDROOM POST WORKS: Modern, spacious and homely, ideal master bedroom with top quality finish.
Bedroom Before
Bedroom After
LOUNGE: Room was an awkward shape combined with three doors making furnishing difficult, neither an inviting room nor ideal for modern living.
SCOPE OF WORKS: Stripping all surfaces, removing the chimney and wall to open up and combine the kitchen, relocate radiator, plaster throughout, install spotlights and ornate cornice, new engineered oak flooring, woodwork, decorate.
FIRST FLOOR BEDROOM POST WORKS: Truly desirable room, warm and homely, great features and mix of modernity, traditional and clean angles, a great room for the target market.
Lounge Before
Lounge After
Lounge Before
Lounge After
KITCHEN: A very awkward space which amounted to the main issue of the house, an almost unusable kitchen.
SCOPE OF WORKS: To remove the chimney and walls between this and living room, install steels and straps, new false ceiling, spotlights, plastered throughout, new woodwork, new cream gloss kitchen with integrated dish washer, under counter fridge, electric oven and gas hob, also modern breakfast bar.
KITCHEN POST WORKS: Modern, contemporary cream gloss kitchen, lovely social area, and perfect for modern living.
Kitchen Before
Kitchen After
Kitchen Before
Kitchen After